Cable line and transformer substation-86 repair

Repair of Transformer substation-86 in the territory of No. 2 and repair of the cable line between territories No. 1 and No. 4 of Korsakovsky base of oil products.

2015
Stages:Deposited object
© 2024 «Staksel». Construction, repair and renovation.
Made in Milax*